SOP
Drawing review steps
The order used to read a flange drawing before an inquiry is passed on for quotation.
Updated: Oct 6, 2026
Read the drawing in this order. Stop and ask when a line is missing or when the drawing and the email disagree.
Steps
- Name the flange type from the outline.
- Copy the standard number printed on the drawing.
- Copy the size and the pressure class.
- Copy the material and the facing.
- Copy the quantity, and the destination if it is written.
- Keep the drawing with the inquiry. Do not quote from the email text alone when a drawing is attached.
This procedure does not assign a price or a delivery date.